
Drainage, line marking and kerbing as one package
A car park or yard needs more than a flat surface. Falls and drainage have to be right so rainwater runs to gullies rather than pooling or running off site, and we build that into the levels when we lay the base.
Once the surface is down, we handle the line marking and kerbing too, including bays, directional arrows, disabled bays and kerb lines, so you are not coordinating several contractors for one job.
- Falls and drainage designed into the base
- Car park bays, EV bays and disabled bays marked out
- Directional arrows and other markings
- Kerbing to define bays, islands and site boundaries









